Skip to content

380 kV Overhead Transmission Line

The high-voltage overhead transmission line starts at the 380/110/13.8 kV Yanbu 3, PS1 Substation, near Yanbu’s industrial zone and ends in the 380/13.8 kV Yanbu 3, PS2 Substation in Musajeed.
Energy & Climate ProtectionPower Transmission & Distribution
Client:
SWCC, Saline Water Conversion Company
Location:
Saudi Arabia
Time frame:
2013–2016
    • 380 kV double circuit overhead transmission line
    • Starting at sea level, going up to 850 m in rocky terrain
    • Length: 85 km
    • 234 self-supporting lattice towers
    • Highest tower: 94 m (crossing point)
    • Conductor: 4 bundles with AAAC 500 conductor
    • Long-rod porcelain insulators
    • Foundation: pier foundation or pad and chimney foundation
  • Engineering
  • Project Management

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers