


Overview
A9 Pyhrn Motorway, Wald Tunnel, Live Fire Tests
About the Project
- Client:
- ASFINAG Bau Management GmbH, Vienna
- Location:
- Austria
- Time frame:
- 2015–2018
Technical Data
- Twin-tube tunnel with one-way traffic
- Length: approx. 2,850 m
- Retrofitting of escape routes
- Construction of additional emergency call and firefighting niches
- Renewal and adaptation of power supply
- Installation of high-pressure water mist system
- Renewal of the tunnel ventilation system
ILF-Services
- Management Consulting
- Engineering
- Project Management