Endikat Hydropower Project
About the Project
- Client:
- Confidential
- Location:
- Indonesia
- Time frame:
- 2019 - 2021
Technical Data
- Installed Capacity: 65,6 MW
- CFRD Dam: 30 m height
- Gross Head: 124.3 m and 121.9 m
- Discharge per unity: 15 m3/s
- Total tunnel length: 9.66 km
- Electrical connection: 150 kV @10km
ILF-Services
- Management Consulting
- Engineering