Overview
ENECO Gas Storage Facility, Epe
About the Project
- Client:
- Visser & Smit Hanab B.V.
- Location:
- Germany
- Time frame:
- 2008–2013
Technical Data
- 2 salt caverns,
total volume: 1,000,000 m³ - Working gas capacity: approx. 130 million Sm³
- Gas injection rate: 2 × 100,000 Sm³/h
- Gas withdrawal rate: 2 × 200,000 Sm³/h
- 2 withdrawal trains,
2 electrically driven reciprocating compressors (2 × 6.35 MW) - Guaranteed availability of 99.1 %
ILF-Services
- Engineering
- Project Management