Overview
Nam Ngone 2 Hydropower Project
About the Project
- Client:
- Rendcor GmbH, Austria
- Location:
- Lao PDR
- Time frame:
- 2017 - 2018
Technical Data
- Installed Capacity: 25.2 MW
- Design Flow: Two Intakes with 3.6 m3/s and 2.33 m3/s
- Design Head: 519.4 m
- Headworks: Weir with lateral intake, Tyrolean weir with attached desander
- Waterway: Concrete lined Free Flow Canal
- Powerhouse: 2 Pelton Turbines
ILF-Services
- Management Consulting
- Engineering