Overview
Nam Ou 7 Hydropower Project
About the Project
- Client:
- Department of Energy Business (DEB), Ministry of Energy and Mines, Government of Laos
- Location:
- Lao PDR
- Time frame:
- 2017 - 2022
Technical Data
- Installed Capacity: 210 MW
- Design Flow: 235 m3/s
- Design head: 104 m
- Dam: CFRD dam, 143,5 m height, 592,5 m crest length
Powerhouse: 2 Francis Turbines
ILF-Services
- Management Consulting
- Engineering
References