Skip to content

Nawara Gas Field Development

The greenfield project for sour gas development of the Nawara field comprises the detailed design of a central processing facility and the required field gathering and distribution systems for the Tunisian-German EPC Joint Venture.
Resources & Sustainable IndustryUpstream
Client:
Joint Venture Max Streicher und Bouchamaoui Industries (MSBI) Gas Field Operator: OMV E&P and ETAP
Location:
Tunesia
Time frame:
2014–2018
  • Field: gas and condensate, sour
  • No. of production wells: 9
  • Processing capacity:
    Gas: 100 mmscfd,
    Condensate: 7 mbpd
  • Export systems:
    Gas pipeline: 24”
    Condensate pipeline: 6”
  • Engineering
  • Project Management

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers
    NawaraGas Field Development, Tunesia