
Overview
Overhead Transmission Line from Qua Iboe Terminal to Ikot Abasi
About the Project
- Client:
- NNPC / MPN Exxon Mobil
- Location:
- Nigeria
- Time frame:
- 2009–2010
Technical Data
- Length: 54 km in total
- 330 kV overhead transmission line with 2 circuits
- 2 bundle conductors 380/50 ACSR (Bison)
- 1,000 MW
- 2007 TCN Standards
- Connection to substations at QIT and Ikot Abasi
ILF-Services
- Engineering
- Project Management
References







