Overview
Redevelopment/Rehabilitation of Bregenz Harbor
About the Project
- Client:
- Hafen Bregenz GmbH
- Location:
- Austria
- Time frame:
- 2008–2011
Technical Data
- Western breakwater: stabilization and extension of the harbor-side sheet pile wall all the way to the tip of the breakwater, new design of the lake-side seating steps
- Promenade: widening of the promenade by approx. 25 m and construction of a new harbor wall
- Harbor basin: dredging works (approx. 13,000 m³) including placement of dredged material in the promenade area
- Harbor building: pile-supported reinforced concrete slab in front of the harbor building
- Fuel berth: extension and rehabilitation of the steel structure for two re-fueling sites
- Eastern breakwater: extension including new breakwater tip and new shore protection, light houses for western (height 30 m) and eastern (height 20 m) breakwater
- Marina: piers and access to 110 berths
- Port area: construction of piers for eight large vessel moorings
ILF-Services
- Management Consulting
- Engineering
- Project Management
References