Overview
Belchen 3rd Tunnel Tube
About the Project
- Client:
- ASTRA, Swiss Federal Roads Office, Bern
- Location:
- Switzerland
- Time frame:
- 2007–2020
Technical Data
- 2-lane national road tunnel
- Project design for TBM and NATM excavation
- Excavation diameter of TBM: 13.98 m
- Intermediate slab, service duct below the road surface
- Excavation in gypsum keuper
- Double-shell lining with vault thickness of up to 1.10 m in the tunnel invert
and 75 cm in the crown, reinforced for approx. 45% of the tunnel length - Excavation and lining of 11 cross connections using the drill and blast method,
roadheaders and mechanical excavation as well as 2 underground control stations
ILF-Services
- Engineering
- Project Management