


Overview
Common Seawater Supply Project (CSSP)
About the Project
- Client:
- South Iraq Oil Company (SOC)
- Location:
- Iraq
- Time frame:
- 2014–2016
Technical Data
- Pipeline length: 436 km (steel, 3LPE/FBE)
- Flow capacity: 2 million m³/d (full buildout), 1.2 million m³/d (phase 1)
- Diameter range: 32” to 56” (single & twin lines)
- 1 seawater pipeline system
- 12 terminal stations
ILF-Services
- Management Consulting
- Engineering
- Project Management
References







