



Overview
Serfaus Snow-Making System
About the Project
- Client:
- Seilbahn Komperdell GesmbH
- Location:
- Austria
- Time frame:
- 1992–ongoing
Technical Data
- 3 storage reservoires
- Total storage volume: approx. 426,000 m³
- 5 pumping stations
- Maximum throughput: 1,040 l/s
- Over 85 km of pipelines
ILF-Services
- Consulting Services
- Engineering and Design Services
- Procurement and Contracting Services
- Construction Management and Supervision
- Commissioning and Start-Up Services
- Project Management
References







