Sewer System for the Town of Wattens – Modification/Rehabilitation Sewer System & Stormwater Overflow Structures
About the Project
- Client:
- Marktgemeinde Wattens
- Location:
- Austria
- Time frame:
- 2010–2014
Technical Data
- Construction of new sewer system
- Modification of 2 stormwater overflow structures
- Construction of 2 new stormwater retention tanks
with tank volumes of 550 m³ and 690 m³ - Construction of 3 new high water pumping stations
ILF-Services
- Management Consulting
- Engineering
- Project Management