
Overview
Tha - Htay Hydropower Project
About the Project
- Client:
- Department of Hydropower Implementation (DHPI), Myanmar
- Location:
- Myanmar
- Time frame:
- 2020 - ongoing
Technical Data
- Installed Capacity: 111 MW
- Design Flow: 210 m3/s
- Design Head: 62.48 m
- Dam: 90.83 m Zoned Type Rock Fill Dam
- Spillway: gated spillway with capacity of 9’000 m³/s
- Powerhouse: 3 Vertical Francis turbines
ILF-Services
- Management Consulting
- Engineering
- Project Management
References







