Skip to content

Al Yassat Island Hybrid Power Plant

Integration of a photovoltaic-diesel hybrid power plant into the off-grid system of Al Yassat Island in the UAE. Integration of renewable energy into the diesel off-grid system to maximize the fuel savings and to reduce the overall power generation cost.
Energy & Climate ProtectionHybrid Power
Client:
Dubai Electricity and Water Authority (DEWA)
Location:
United Arab Emirates
Time frame:
2013
    • Diesel power plant: 4 MW
    • MV grid: 11 kV
    • PV power plant: 0.8 to 3.0 MW
    • Wind power plant: 0.6 to 1.5 MW
    • Battery storage: up to 8 MWh/2 MW
  • Management Consulting
  • Engineering
  • Project Management

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers