


Overview
Expansion of Lam & Zhdanov Offshore Fields
About the Project
- Client:
- Dragon Oil
- Location:
- Turkmenistan
- Time frame:
- 2012–2014
Technical Data
- Fluids: oil/gas/water
- No. of production wells: 60
- No. of platforms: 14
- Trunk line, diameter: 30″
length (offshore): 28 km, length (onshore): 10 km - Transport capacity:
Gas: 220 mmscfd
Liquids: 100 mbpd
Crude oil: 87 mbpd
Produced water: 13 mbpd - Existing onshore CPF (tie-in):
Oil and gas processing
Water treatment,
Processing trains: 4
Storage capacity: 48,525 m³
ILF-Services
- Engineering
- Project Management
References







