


Overview
Trans Adriatic Pipeline
About the Project
- Client:
- Trans-Adriatic Pipeline AG
- Location:
- Albania
- Time frame:
- 2003–2019
Technical Data
- Medium: natural gas
- Length: 883 km incl. 105 km offshore
- Diameter: onshore 48”, offshore 36”
- Capacity (phases 1 and 2): 10; 20 bcm/a
- Design pressure: onshore 95 barg, offshore 145 barg
- No. of compressor stations: 2 (4)
- 1 pipeline receiving terminal
ILF-Services
- Management Consulting
- Engineering
- Project Management
References







