Woodsmith Mine Project
About the Project
- Client:
- Strabag UK Ltd.
- Location:
- United Kingdom
- Time frame:
- 2020 - ongoing
Technical Data
- Polyhalite seam at a depth of 1,500 m
- Expected production rate of 10 million tonnes per annum over a design life of 50 years
- Production and service shafts – depth: 1,600 m
- Material Transport System, Lockwood Beck and Ladycross Shafts – depth: 360 m–380 m
- Mineral Transport System (MTS) tunnel – length: 37 km – world record for the longest single TBM drive
- MTS tunnel excavated by a 6 m diameter single-shield hard rock TBM
ILF-Services
- Management Consulting
- Engineering