Skip to content

Xekong 4A & 4B Hydropower Project

The Xekong 4 hydropower plant consists of two planned dams and power plants - Xekong 4A and Xekong 4B. The two dam sites are located on the Xekong River up-stream of Xekong City, with the Xekong 4A site about 30 km from Xekong City and the Xekong 4B site about 80 km upstream of Xekong City.
Energy & Climate Protection
Client:
Ministry of Energy and Mines (DEM), Government of Lao PDR
Location:
Lao PDR
Time frame:
2021 - ongoing
  • Installed Capacity: 175 MW & 180 MW
  • Project type: 2 Storage Hydroelectric Power Plants
  • Design Flow: 161.8 / 81.0 m3/s & 116.65 m3/s
  • Net Head: 59.5 m & 88.4 m
  • Powerhouse: 2 x Vertical Francis turbines
  • Management Consulting
  • Engineering

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers