

Overview
2 km Long Twin-Tube Road Tunnel in Austria
About the Project
- Client:
- n.a.
- Location:
- Austria
- Time frame:
- 2015–2017
Technical Data
- Tunnel length: approx. 2 km
- Twin-tube road tunnel with two lanes per direction
- 10 cross passages
- 24 jet fans in northbound tube
- 18 jet fans in southbound tube
ILF-Services
- Management Consulting
- Engineering
- Project Management