

Overview
A02 Motorway – Klagenfurt Northern Bypass
About the Project
- Client:
- ASFINAG
- Location:
- Austria
- Time frame:
- 2012–2015
Technical Data
- Two independent road tunnels
- Tunnel length: approx. 1.1 km and 3.3 km
- Twin-tube tunnels with unidirectional traffic on 2 lanes
- Longitudinal ventilation systems including a pointwise extraction
ILF-Services
- Management Consulting
- Engineering
- Project Management