Skip to content

B23 Garmisch-Partenkirchen Bypass

The relocation of the federal road B23 west of Garmisch-Partenkirchen and the construction of the Kramer Tunnel serve to relieve Garmisch of through traffic.
Transportation & Urban SpacesRoads
Client:
Staatliches Bauamt Weilheim
Location:
Germany
Time frame:
2005–ongoing
    • Two-lane federal road
    • Length: 5.4 km
    • Single-tube two-lane road tunnel
    • Length: 3.6 km
    • Emergency tunnel (length: 3.7 km), 6 bridges
    • 1 watertight concrete structure, 2 access points incl. roundabouts
    • Relocation of the Loisach River
  • Management Consulting
  • Engineering
  • Project Management

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers