Koralm Pumped Storage Plant
About the Project
- Client:
- Pumpspeicherkraftwerk Koralm GmbH
- Location:
- Austria
- Time frame:
- 2015-ongoing
Technical Data
- Installed capacity: 1,000 MW (greatest flexibility provided by ternary machine sets)
- Design flow (turbine operation): 160 m³/s
- Gross Head: 660 m
- Headrace tunnel, length: 1.1 km
- Pressure shaft, length: 0.65 km
- Tailrace tunnel, length: 3.9 km
- Powerhouse cavern: 318/25/38 m (L/W/H)
- Storage reservoirs: 4.5 million m³ each
- Alliance model (client consisting of private entities, construction companies and E+M
manufacturer)
ILF-Services
- Management Consulting
- Engineering
- Project Management