
Overview
Saravan Downstream Hydropower Project
About the Project
- Client:
- Natural Current Energy Hydropower Co., Ltd
- Location:
- Myanmar
- Time frame:
- 2022
Technical Data
- Installed Capacity: 2,493 MW (18 x 136 MW + 3 x 15 MW)
- Design Flow: 13,648 m 3/s (18 x 744.4 m3/s + 3 x 82.7 m3/s
- Net head: 25.4 m
- Headworks: Dam Barrage Type (height: 51.0m)
- Spillway: 20 radial gates (20.0m x 20.5 m)
- Energy generation: 9,681 Gwh/a
ILF-Services
- Management Consulting
- Engineering
- Project Management
References







