2. Tube of Gotthard Road Tunnel

The second Gotthard Road Tunnel enhances traffic safety and infrastructure resilience with a nearly 17 km tunnel and extensive underground facilities, scheduled for completion in 2030.
Transportation & Urban SpacesTunnels
Client:
Bundesamt für Strassen ASTRA
Location:
Switzerland
Time frame:
2018 - 2030
  • TBM excavation: 16.9 km using two TMBs Ø 12.26 m

  • TBM excavation: 2 x 4-5 km excavated up to fault zones (TBM-G Ø 7.06 m / TBM-S Ø 7.30 m)

  • Excavation in Fault Zones: 120 m2 excavation, yielding support, 2 x approx. 300 m

  • 68 cross passages, of which 10 are trafficable with substations

  • 5 mined control stations with an excavation volume of up to 50,000 m3, lay-bys 90 m

  • Material logistics for supply and disposal, material processing for concrete aggregates

  • Production facilities for service line ducts and segmental lining below and above ground

  • Ancillary and connection works (utility lines, control stations, portals, track and road construction, canteen, accomodation facilities, waste disposal area, and parking)

  • Management Consulting
  • Engineering
  • Project Management

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers