Through Station Luzern Subproject 3 Neustadt Tunnel
About the Project
- Client:
- SBB AG
- Location:
- Switzerland
- Time frame:
- 2021 - 2022
Technical Data
- NATM advance in 500 m of loose rock
- 1,200 m in rock with roadheader
- Two bifurcation caverns
- Excavation cross-section: up to 144.2 m2
- 200 m cut-and-cover tunnel
- Two vertical emergency exits
- Tunnel crossing underneath existing SBB access tunnel at Luzern railway station