


Overview
SS12 Branzoll–Bozen Bypass Road
About the Project
- Client:
- Autonomous Province of Bolzano/South Tyrol
- Location:
- Italy
- Time frame:
- 1996–2011
Technical Data
- Total length: approx. 9 km
- 2 mined tunnels
- Length: 2.9 km and 2.4 km
- 1 cut-and-cover tunnel
- Length: 672 m
- Escape tunnel, bridges, open-cut structures
- 6 junctions, 4 roundabouts
- Underground turnout caverns (4-lane)
ILF-Services
- Consulting Services
- Engineering and Design Services
- Procurement and Contracting Services
- Construction Management and Supervision
- Project Management
References







