Nam Phak I, II & III Hydropower Projects

ILF carried out a technical due diligence and optimized the existing design resulting in a financial return by avoiding the cascade scheme. On this basis, ILF recommended a one-step scheme using the upstream location of the HPP dam and the inlet, followed by a 20 km waterway to the down-stream powerhouse. In this way, the investment was reduced by two thirds compared to the cascade model and the 15 % loss in power generation was compensated.
Energy & Climate Protection
Client:
Confidential
Location:
Lao PDR
Time frame:
2015 - 2017
  • Installed Capacity: 30 MW, 26 MW and 40 MW
  • Design Flow: 39.7 m3/s, 39.1 m3/s and 37.4 m3/s
  • Headworks Nam Phak I: Concrete gravity dam (height 51.8 m, crest length 128 m)
  • Headworks Nam Phak II: Concrete gravity dam (height 30.1 m crest length 81 m)
  • Headworks Nam Phak III: Concrete gravity dam (height: 51.8 m, crest length: 128 m)

  • Engineering
  • Project Management

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers
    Nam Phak I, II & III Hydropower Project