


Overview
Trans-Asia Gas Pipeline
About the Project
- Client:
- Trans-Asia Gas Pipeline Company Limited (TAGP)
- Location:
- Kazakhstan
- Time frame:
- 2007–2017
Technical Data
- Medium: natural gas
- Length: 1,825 km
- No. of compressor stations: 10
- Diameters: 2 × 42”, 1 × 48”
- Design pressure: 98 bar
- Capacity: 55 bcm/a
- No. of block valve stations: 184
- No. metering stations: 4
- No. of pigging stations: 28
ILF-Services
- Management Consulting
- Engineering
- Project Management
References







