



Overview
Brenner Base Tunnel
About the Project
- Client:
- Brenner Basistunnel BBT SE
- Location:
- Austria
- Time frame:
- 1977–ongoing
Technical Data
- Length: 55 km
- Excavation: NATM/TBM (Ø 9.94 m)
- Cross-passages (every 333 m)
- Rock overburden
ILF-Services
- Consulting Services
- Engineering and Design Services
- Procurement and Contracting Services
- Construction Management and Supervision
References







