Limberg II Pumped Storage Plant, Kaprun HEPP
About the Project
- Client:
- VERBUND
- Location:
- Austria
- Time frame:
- 2006–2011
Technical Data
- Design discharge in turbine mode: 144 m³/s
- Head: 366 m
- Installed capacity: 480 MW
- Headrace tunnel (inner Ø 6.0–6.2 m, length: 4.2 km)
- Surge tank, inclined shaft (inner Ø 4.8 m, 0.5 km)
- Tailrace tunnel (inner Ø 6.8 m, length: 0.25 km)
- Power house cavern (length: 61.9 m, width: 25 m, height: 25 m)
- 2 machine units (Francis spiral pump turbines and motor generators, vertical axis)