


Overview
Czajka Wastewater Treatment Plant
About the Project
- Client:
- MPWiK S.A., WARBUD S.A.
- Location:
- Poland
- Time frame:
- 2006–2012
Technical Data
- Capacity: 435,000 m³/d
- 2,100,000 PE
- Domestic and industrial wastewater
- Microtunnelling: 6 km
- DN2800
- Sludge incineration: FBC 28 t/h
- TBM tunnel: 1,300 m, Ø 4.5 m
ILF-Services
- Engineering
- Project Management
References







