


Overview
New Construction of Kugelstein Bridge
About the Project
- Client:
- ÖBB Infrastruktur AG, Wien
- Location:
- Austria
- Time frame:
- 2015–2016
Technical Data
- Double-track structure consisting of a reinforced concrete arch, span 60.0 m
- Girders and hangers made of steel
- Deck and arches of bridge made of reinforced concrete, arch height approx. 15.0 m
- Max. speed: 130 km/h
- Structure erected in lateral position with subsequent transverse displacement of the new supporting structure
ILF-Services
- Project Management
References







