



Overview
Vienna–Graz Railway Line
About the Project
- Client:
- ÖBB-Infrastruktur AG
- Location:
- Austria
- Time frame:
- 2006-2012
Technical Data
- Overall length of line: 34 km
- Design speed: 230–250 km/h
- Length of Semmering Base Tunnel: 27.7 km
- Twin-tube tunnel system
- Cross passages at intervals of 500 m
- Emergency station inside the tunnel
ILF-Services
- Consulting Services
- Engineering and Design Services
- Construction Management and Supervision
- Project Management
References







