

Overview
A11 Karawanken Motorway – Karawanken Tunnel
About the Project
- Client:
- ASFINAG
- Location:
- Austria
- Time frame:
- 2012–2015
Technical Data
- Tunnel length: approx. 8 km
- Single-tube tunnel with two way traffic on 2 lanes
- Combination of semi- and fully transverse ventilation systems
- Ventilation buildings at each tunnel portal
- Saccardo nozzles close to the tunnel portals
ILF-Services
- Management Consulting
- Engineering