

Overview
B23 Garmisch-Partenkirchen Bypass
About the Project
- Client:
- Staatliches Bauamt Weilheim
- Location:
- Germany
- Time frame:
- 2005–ongoing
Technical Data
- Two-lane federal road
- Length: 5.4 km
- Single-tube two-lane road tunnel
- Length: 3.6 km
- Emergency tunnel (length: 3.7 km), 6 bridges
- 1 watertight concrete structure, 2 access points incl. roundabouts
- Relocation of the Loisach River
ILF-Services
- Management Consulting
- Engineering
- Project Management
References







