Overview
Nam Kong 2 Hydropower Project, Phases 1 and 2
About the Project
- Client:
- Chaleun Sekong Group Co. Ltd.
- Location:
- Lao PDR
- Time frame:
- 2015–ongoing
Technical Data
- Catchment area: 861 km²
- Dam height: 50 m
- Headrace tunnel: 1.43 km
- Penstock: 350 m
- Installed capacity: 3 x 22 MW
- Design head: 97.9 m
- Annual power generation: 263.11 GWh
ILF-Services
- Management Consulting
- Engineering
- Project Management