Overview
Wierzchowice Underground Gas Storage
About the Project
- Client:
- Polish Oil and Gas Company (PGNiG S.A.)
- Location:
- Poland
- Time frame:
- 2010–2013
Technical Data
- Storage capacity: 1.2 bcm (target: 3.5 bcm)
- Injection/withdrawal capacity: 400,000/600,000 Sm³/h
- Suction pressure: 40-84 barg
- Storage pressure: 65-125 barg (target: 190 barg)
- Output of CC power plant: 37 MWel
- Output of turbo expander unit: 11.0 MWel
- TUCOs: 2x10 MW, with active magnetic bearings
- High-speed VFD-driven electrical motor
ILF-Services
- Management Consulting
- Engineering
- Project Management
References