
Overview
Four-track upgrade of the Linz–Marchtrenk and Marchtrenk–Wels sections of the Linz–Wels western railway line
About the Project
- Client:
- ÖBB-Infrastruktur AG
- Location:
- Austria
- Time frame:
- 2004-ongoing
Technical Data
- New four-track high-capacity railway line
- Length: 22 km
- Design speed: max. 230 km/h
ILF-Services
- Management Consulting
- Engineering
References







