Overview
Eppenberg Tunnel
About the Project
- Client:
- SBB
- Location:
- Switzerland
- Time frame:
- 2011 - 2021
Technical Data
- Twin-track railway tunnel, length: 3.1 km
- Advance: TBM (Ø 12.78 m) – mix shield TBM for rock and soft ground (slurry)
- 2 shafts and 1 adit as escape structures
- Double-shell lining with precast segments and in-situ concrete lining
- Geology: rock and soft ground
- Cut-and-cover section, fly overs in the connection area
- Construction pit with support
- Connection of new line to existing line during railway operation
ILF-Services
- Engineering
- Project Management
References