Eppenberg Tunnel

To eliminate the bottleneck on the 6 km-long Olten–Aarau section of the Bern–Olten–Zurich railway line, SBB is upgrading the railway line to four-track operation, a project which includes the 3 km-long Eppenberg tunnel.
Transportation & Urban SpacesTunnelsRailways
Client:
SBB
Location:
Switzerland
Time frame:
2011 - 2021
  • Twin-track railway tunnel, length: 3.1 km
  • Advance: TBM (Ø 12.78 m) – mix shield TBM for rock and soft ground (slurry)
  • 2 shafts and 1 adit as escape structures
  • Double-shell lining with precast segments and in-situ concrete lining
  • Geology: rock and soft ground
  • Cut-and-cover section, fly overs in the connection area
  • Construction pit with support
  • Connection of new line to existing line during railway operation
  • Engineering
  • Project Management

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers
    Eppenbergtunnel