


Overview
Ferngas Pipeline Renewal
About the Project
- Client:
- Ferngas Netzgesellschaft mbH
- Location:
- Germany
- Time frame:
- 2017–2022
Technical Data
- Medium: natural gas
- Local supply and distribution network
- Length of the 16”/20” main pipeline:
125 km - Length of the 4”/6” distribution lines:
12 km - Design pressure: 84 bar
- No. of block valve stations: 19
ILF-Services
- Project Management
References







