Kemerleng Hydropower Project

The services provided by ILF Consulting Engineers (Asia) started with a site survey to validate the original site conditions. Subsequently, preliminary concepts for the hydropower project were developed and the best alternative was selected using ILF's own software RENRisk™. The alternative study includes pre-dimensioning of the main structures, estimation of investment expenditures and financial evaluation, supplemented by Monte Carlo simulation.
Energy & Climate Protection
Client:
Akuo Energy Indonesia, Jakarta
Location:
Indonesia
Time frame:
2018 - 2019
  • Installed Capacity: 2 x 2.0 MW
  • Design Flow: 4.5 m3/s
  • Design head: 120 m
  • Headwork: Tyrolean Weir
  • Waterway: 2.2 km Concrete Lined Canal
  • Turbine: 2 Francis Turbines

  • Management Consulting
  • Engineering
  • Project Management

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers
    Kemerleng Hydropower Project