
Overview
Nam Bi Cascade Hydropower Project
About the Project
- Client:
- Confidential
- Location:
- Lao PDR
- Time frame:
- 2018 - 2019
Technical Data
- Installed Capacity: 52 MW, 71 MW and 12 MW
- Max. Design Flow: 31.1 m3/s, 23.7 m3/s and 13.2 m3/s
- Design head: 196.8 m, 348.3 m and 110.1 m
- Dam: Two concrete gravity dams and one earth fill dam (height 37.6 m, 55 m and 35.5 m)
- Powerhouse: 2 Francis, 2 Francis and 2 Francis (Hor.)
ILF-Services
- Management Consulting
- Engineering
References







