Overview
Halfaya Oil Field Development
About the Project
- Client:
- CNPC, MOC, Total, Petronas Consortium
- Location:
- Iraq
- Time frame:
- 2011–2013
Technical Data
- 100 mbpd oil and 69 mmscfd gas,
25 production wells,
3 production trains - Oil processing: 2-stage gas/oil-separation
dehydration, desalting, stabilisation - Gas processing: compression and wet sour gas export to power plant
- Water treatment: skimming tank, oil recovery, evaporation pond
- Export facilities:
- gas compression
- oil pumping station
- 18″ oil export pipeline
- 16″ wet sour gas export pipeline
ILF-Services
- Project Management
- Engineering