About the Project
- Client:
- Austrian Power Grid AG
- Location:
- Austria
- Time frame:
- 2015–2016
Technical Data
- Conversion of existing 380/220 kV substation
- 10 contract sections for retrofitting from flexible to tubular busbars
- Improvement of short-circuit resistance
- 380/220 kV with 660 MVA incl. throttle system with 100 MVAr
ILF-Services
- Engineering