Skip to content

Phoenix Pumped Hydroelectric Energy Storage

Phoenix PHES is a closed-loop project located adjacent to Lake Burrendong in NSW. The plant has a capacity of 800 MW and involves the construction of a new upper reservoir and a lower reservoir. An underground waterway including surge facility and shaft powerhouse are planned.
Energy & Climate ProtectionHydropower
Client:
GHD Pty Ltd
Location:
Australia
Time frame:
2022–ongoing
  • Installed capacity: 800 MW
  • Upper reservoir volume: approx. 19.4 million m3
  • Lower Reservoir volume: approx 20.8 million m3
  • Gross head: approx. 320 m
  • Waterway length: 3300 m
  • Management Consulting
  • Engineering
  • Project Management

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers