


Overview
Copper Mine Centinela, Infrastructure and Sea Water Supply
About the Project
- Client:
- Minera Centinela S.A.
- Location:
- Chile
- Time frame:
- 2014–2017
Technical Data
- Length/diameter: 144 km, 38“ and 36“
- Steel pipes (3LPE/CML)
- Capacity of first expansion stage: 1.1 m³/s
- Capacity of second expansion stage: 1.3 m³/s
- 5 pumping stations
- Difference in elevation: 2,300 m
ILF-Services
- Engineering
- Project Management
References







