
Overview
Al Mu’ajjiz Terminal, Water Treatment and Rehabilitation
About the Project
- Client:
- JGC/Saudi Aramco
- Time frame:
- 2015 - 2016
Technical Data
- 10 crude oil tanks à 170,000 m³
- Water content in oil: max. 0.5 % Capacity: 1,600 m³/d
- Impurities: TDS, Ba, Mn, BTEX, etc.
- Effluent quality: RCER, SAES