Crystal Gas Storage Facility, Etzel
About the Project
- Client:
- EDF Gas Division, EnBW – Energie Baden-Württemberg AG
- Location:
- Germany
- Time frame:
- 2009–2015
Technical Data
- 4 salt caverns with 650,000 m³ storage capacity each
- Working gas capacity: approx. 351 million Sm³
- 2 production trains: 2 × 50 %
- Gas injection rate: max. 300,000 Sm³/h
- Gas withdrawal rate: max. 600,000 Sm³/h
- Option for plant expansion: +4 caverns, +2 production trains
- Gas plant operation time: 35 years
ILF-Services
- Engineering
- Project Management