


Overview
Usari Pressure Maintenance Platform
About the Project
- Client:
- Mobil Producing Nigeria Ultd.
- Location:
- Nigeria
- Time frame:
- 2004–2005 (design phase)
Technical Data
- 8-leg jacket structure at 72 ft. water depth,
topside based on a modular design concept - Water injection: 220 mbpd water at 2,600 psig
- Fine filtration: 98 %, particle removal > 5 µm
- Vacuum deaeration: 20 ppb oxygen content
- Produced water: 120 mbpd water at 180 mbpd oil
ILF-Services
- Engineering
References







